Factory making Magnesium Sulphate Fertilizer - Monopotassium Phosphate MKP – Lemandou
Factory making Magnesium Sulphate Fertilizer - Monopotassium Phosphate MKP – Lemandou Detail:
| Item | Specification |
| Main Contents % | ≥ 99.0 |
| Phosphorus (as P2O5) % | ≥ 52.0 |
| Potassium Oxide (as K2O) % | ≥ 34.0 |
| pH | 4.4-4.8 |
| Moisture % | ≤ 0.2 |
| Heavy Metal (as Pb) % | ≤ 0.005 |
| Iron (as Fe) % | ≤ 0.003 |
| Arsenic (as As) % | ≤ 0.005 |
| Water Insoluble % | ≤ 0.1 |
| Chloride (as Cl ) % | ≤ 0.2 |
CAS No.:7778-77-0
Molecular Weight:KH2PO4
EINECS No.:231-913-4
Appearance:136.09
Molecular Formula:White or colorless crystal
Packing
25 KG
Dosing Instructions Fertigation
| Crop | Application date | Total dosage | Dosage per plants |
| Fruit trees (adult trees) | As of start fertigation until 4 to 6 weeks before harvesting | 100-200 kg/ha. | Subject to soil and climatic conditions |
| Banana | During the entire fertigation program | 200-300 kg/ha | Subject to soil and climatic conditions |
| Vegetables | Beginning of vegetative growth until 2-4 weeks before harvesting |
100 – 250 kg/ha | Subject to soil and climatic conditions |
| (Processing) vegetables • Potatoes • Tomatoes |
From tuber initiation till ripening stage From 1 month after transplantation until maturation stage |
100 – 200 kg/ha 150 – 300 kg/ha |
Subject to soil and climatic conditions |
Product detail pictures:
Related Product Guide:
We believe in: Innovation is our soul and spirit. High-quality is our life. Purchaser need is our God for Factory making Magnesium Sulphate Fertilizer - Monopotassium Phosphate MKP – Lemandou , The product will supply to all over the world, such as: Orlando, Kuwait, Greek, With the support of our highly experienced professionals, we manufacture and supply best quality products. These are quality tested at various occasions to ensure only flawless range is delivered to customers, we also customize the array as per the need of customers to meet the requirement of customers.
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.
Write your message here and send it to us









